Wednesday, 26 November 2014

Underfloor Heating Begins

After a long delay, work has started again on the ground floor; this time on the floor itself. Underfloor heating pipework is being laid out and clipped into place on top of the Insufill/limecrete mix and insulation slabs. A limecrete slab will then be poured on top of the pipework to bring it up to the final level.

The plastic framework that holds the pipes down:

Front room (dining room):

The pipes clipped into place:

Rear adjoining room (kitchen):

Rear hallway:

The pipes are leading under the stairs where they will be connected to manifolds and pump:

The return:

More to come...