Wednesday 26 November 2014

Underfloor Heating Begins

After a long delay, work has started again on the ground floor; this time on the floor itself. Underfloor heating pipework is being laid out and clipped into place on top of the Insufill/limecrete mix and insulation slabs. A limecrete slab will then be poured on top of the pipework to bring it up to the final level.

The plastic framework that holds the pipes down:



Front room (dining room):


The pipes clipped into place:


Rear adjoining room (kitchen):



Rear hallway:


The pipes are leading under the stairs where they will be connected to manifolds and pump:




The return:




More to come...