Saturday 31 August 2013

External Render Removal

Work has started again after a long break. P&K Haigney have been contracted to replace the cement-based external render on the back of the house and to repair/replace any window heads that need attention.

Work started today with the scaffolding of the rear of the house, over the return:









The view of the gutters, completely packed:


And the entire lower section of tiles have slid down over the gutters:


View of the new top floor bathroom window:


Ground floor rear window, with render removed:


Vent below the ground floor rear window: